Phywave offload in Baltimore

On June 1 we climbed aboard the transport ship Spiegelgracht in Baltimore to offload my new sailboat Phywave. They swung it over the side and lowered it to the personnel deck level where we stepped over the railing and across to the deck of the still swinging Phywave. We were lowered another 20-25 feet to the water where we started the engine and waited for the lifting slings to be cleared. With that done we motored 4 hours south down the Chesapeake Bay to the Jabin boatyard/marina in Annapolis where Phywave will be for the first steps of its final outfitting.